TY - GEN
T1 - Updating Nuclear Energy Cost Estimates for Net Zero World Initiative
AU - Guaita, Nahuel
AU - Abou-Jaoude, Abdalla
AU - Larsen, Levi M.
AU - Stauff, Nicolas E.
N1 - Publisher Copyright:
© 2024 Pacific Basin Nuclear Conference, PBNC 2024. All rights reserved.
PY - 2024
Y1 - 2024
N2 - Energy modeling of decarbonized scenarios in integrated energy systems requires nuclear energy parameters that are critical for forecasting, modeling and cost structure analysis. Using updated real-world data has always been a challenge to estimate current nuclear reactors costs and deployment scenarios. Given this, an updated set of parameters for overnight capital costs and operation and maintenance costs are estimated for the Net Zero World initiative using recent reports that provided a vast set of open sources data inputs. This paper follows the methodology developed in the Net Zero World report and applies the new ranges estimated in the Gateway for Accelerated Innovation in Nuclear report that address many of the current challenges in obtaining accurate cost data for advanced nuclear concepts. The final goal is to provide new estimates of the overnight capital costs and operational costs for different countries. The present paper improves the earlier capital cost estimations, building on recent literature that aims to obtain accurate data for modeling and simulation to enhance energy system evaluations and support decision-making in areas like decarbonization and capacity expansion. Finally, the paper compares the new cost estimates with the old cost results.
AB - Energy modeling of decarbonized scenarios in integrated energy systems requires nuclear energy parameters that are critical for forecasting, modeling and cost structure analysis. Using updated real-world data has always been a challenge to estimate current nuclear reactors costs and deployment scenarios. Given this, an updated set of parameters for overnight capital costs and operation and maintenance costs are estimated for the Net Zero World initiative using recent reports that provided a vast set of open sources data inputs. This paper follows the methodology developed in the Net Zero World report and applies the new ranges estimated in the Gateway for Accelerated Innovation in Nuclear report that address many of the current challenges in obtaining accurate cost data for advanced nuclear concepts. The final goal is to provide new estimates of the overnight capital costs and operational costs for different countries. The present paper improves the earlier capital cost estimations, building on recent literature that aims to obtain accurate data for modeling and simulation to enhance energy system evaluations and support decision-making in areas like decarbonization and capacity expansion. Finally, the paper compares the new cost estimates with the old cost results.
KW - maintenance costs
KW - operating
KW - overnight capital costs
UR - https://www.scopus.com/pages/publications/85211603290
UR - https://www.mendeley.com/catalogue/9cb3e1f3-9c46-3d11-85d0-e7561c091792/
U2 - 10.13182/PBNC24-44989
DO - 10.13182/PBNC24-44989
M3 - Conference contribution
AN - SCOPUS:85211603290
SN - 9798331307653
T3 - Pacific Basin Nuclear Conference, PBNC 2024
SP - 123
EP - 132
BT - Pacific Basin Nuclear Conference, PBNC 2024
PB - American Nuclear Society
T2 - 2024 Pacific Basin Nuclear Conference, PBNC 2024
Y2 - 7 October 2024 through 10 October 2024
ER -