T1 - The Versatile Test Reactor Project
T2 - Mission, Requirements, and Description
AU - Roglans-Ribas, Jordi
AU - Pasamehmetoglu, Kemal
AU - O’Connor, Thomas J.
N1 - Funding Information:
Establishing a project organization that would make the most efficient use of the existing resources has been another important goal of the project in its early stages. Multiple universities and subcontractors have also been engaged. At the time of publication, the number and geographical distribution of organizations contributing to the project is displayed in . The VTR project is led by INL, but is substantially supported by other DOE laboratories (ANL, Los Alamos National Laboratory, ORNL, Pacific Northwest National Laboratory, and SRNL). These laboratories manage the overall project and provide the fuel system design and supply studies, the core design, the safety basis, and the safety analysis. Universities contribute primarily to the design of the experimental capabilities, organized in teams by reactor technology (sodium cooled, lead/lead-bismuth cooled, gas cooled, and molten salt) that also include laboratories and the commercial sector. The main role of industry is to provide the plant design and eventually build the plant. GE-Hitachi Nuclear Energy (GEH), with Bechtel National Inc. (BNI) as a subcontractor, was awarded the contract for the development of the conceptual design. A competitive process for the engineering design, procurement, and construction contract was initiated after the conceptual design phase and is currently being negotiated with a team lead by BNI that also includes GEH and TerraPower.
Funding Information:
The submitted document has been created by UChicago Argonne, LLC, operator of ANL. ANL’s work was supported by the DOE NE under contract DE-AC02-06CH11357. The work reported in this summary is the result of ongoing efforts supporting the VTR under the DOE-NE office of Nuclear Fuel Cycle and Supply Chain.
Funding Information:
The submitted document has been created by UChicago Argonne, LLC, operator of ANL. ANL’s work was supported by the DOE NE under contract DE-AC02-06CH11357. The work reported in this summary is the result of ongoing efforts supporting the VTR under the DOE-NE office of Nuclear Fuel Cycle and Supply Chain.
Publisher Copyright:
© 2022 UChicago Argonne, LLC, Operator of Argonne National Laboratory. Published with license by Taylor & Francis Group, LLC.
PY - 2022/3/10
Y1 - 2022/3/10
N2 - The mission of the U.S. Department of Energy (DOE) Office of Nuclear Energy is to advance nuclear power to meet the nation’s energy, environmental, and national security needs. Advanced nuclear technology development, as well as support for the current nuclear power industry, requires a robust infrastructure for experimentation, testing, design evolution, and component qualification. The current lack of fast neutron spectrum testing capabilities has been identified as a significant gap in the U.S. infrastructure that impedes the development of next-generation nuclear reactors—many of which require a fast neutron spectrum for operation—and equally impacts the United States’ ability to regain global technology leadership in this arena. To close the gap and support advanced technology development, the DOE has established the Versatile Test Reactor (VTR) project to provide high-performance testing capability, specifically, a fast neutron source to develop, test, and qualify advanced fuels and materials for the next generation of advanced reactors and existing commercial reactors. This paper describes the establishment of the project, the identification of its mission and requirements, and the design approach and status.
AB - The mission of the U.S. Department of Energy (DOE) Office of Nuclear Energy is to advance nuclear power to meet the nation’s energy, environmental, and national security needs. Advanced nuclear technology development, as well as support for the current nuclear power industry, requires a robust infrastructure for experimentation, testing, design evolution, and component qualification. The current lack of fast neutron spectrum testing capabilities has been identified as a significant gap in the U.S. infrastructure that impedes the development of next-generation nuclear reactors—many of which require a fast neutron spectrum for operation—and equally impacts the United States’ ability to regain global technology leadership in this arena. To close the gap and support advanced technology development, the DOE has established the Versatile Test Reactor (VTR) project to provide high-performance testing capability, specifically, a fast neutron source to develop, test, and qualify advanced fuels and materials for the next generation of advanced reactors and existing commercial reactors. This paper describes the establishment of the project, the identification of its mission and requirements, and the design approach and status.
KW - Test reactor
KW - advanced reactor development
KW - fast reactor
UR - https://www.scopus.com/pages/publications/85126383858
U2 - 10.1080/00295639.2022.2035183
DO - 10.1080/00295639.2022.2035183
M3 - Article
AN - SCOPUS:85126383858
SN - 0029-5639
VL - 196
SP - 1
EP - 10
JO - Nuclear Science and Engineering
JF - Nuclear Science and Engineering
IS - sup1
ER -