TY - GEN
T1 - Power Hardware-In-the-Loop Hydropower and Ultracapacitor Hybrid Testbed
AU - Shafiul Alam, S. M.
AU - Banerjee, Abhishek
AU - Mosier, Thomas M.
N1 - Funding Information:
This manuscript has been authored by Battelle Energy Alliance, LLC under Contract No. DE-AC07-05ID14517 with the U.S. Department of Energy. The work was supported through the U.S. Department of Energy Water Power Tec∗hnology Office HydroWIRES Initiative.
Publisher Copyright:
© 2022 IEEE.
PY - 2022
Y1 - 2022
N2 - Widespread deployment of a proof-of-concept technological solution for power system performance improvement can be accelerated through onsite demonstration and pilot projects. Digital real-time simulation with power hardware-in-the-loop in controlled lab environment is the precursor to de-risk the timely and efficient execution of field demonstration and pilot projects. However, the detailed process of development, characterization, and calibration of such high fidelity simulation testbed needs to be documented in a reproducible and publicly accessible manner to leverage across broader research and development communities. This paper presents such a laboratory testbed to study black start capability of a run-of-river hydro + ultracapacitor hybrid system. Beside the high-fidelity model of the islanded grid with hydropower unit, the testbed includes the energy storage, grid following inverter, and grid emulator hardware. Several aspects such as storage characterization, control and various parameter settings necessary to capture frequency transients during load restoration are described in a comprehensive manner, which led to an effective and timely execution of black start field demonstration with an actual hydropower plant.
AB - Widespread deployment of a proof-of-concept technological solution for power system performance improvement can be accelerated through onsite demonstration and pilot projects. Digital real-time simulation with power hardware-in-the-loop in controlled lab environment is the precursor to de-risk the timely and efficient execution of field demonstration and pilot projects. However, the detailed process of development, characterization, and calibration of such high fidelity simulation testbed needs to be documented in a reproducible and publicly accessible manner to leverage across broader research and development communities. This paper presents such a laboratory testbed to study black start capability of a run-of-river hydro + ultracapacitor hybrid system. Beside the high-fidelity model of the islanded grid with hydropower unit, the testbed includes the energy storage, grid following inverter, and grid emulator hardware. Several aspects such as storage characterization, control and various parameter settings necessary to capture frequency transients during load restoration are described in a comprehensive manner, which led to an effective and timely execution of black start field demonstration with an actual hydropower plant.
KW - PHIL
KW - RTDS testbed
KW - hybrid plants
KW - hydropower
KW - ultracapacitor
UR - https://www.scopus.com/pages/publications/85141504858
UR - https://www.mendeley.com/catalogue/eb13487b-79c5-391d-8a59-ef24588dada9/
U2 - 10.1109/PESGM48719.2022.9917167
DO - 10.1109/PESGM48719.2022.9917167
M3 - Conference contribution
AN - SCOPUS:85141504858
T3 - IEEE Power and Energy Society General Meeting
BT - 2022 IEEE Power and Energy Society General Meeting, PESGM 2022
PB - IEEE Computer Society
T2 - 2022 IEEE Power and Energy Society General Meeting, PESGM 2022
Y2 - 17 July 2022 through 21 July 2022
ER -