Abstract
This report provides recommended parameters for incorporating nuclear energy systems into decarbonization modeling scenarios. The values are primarily intended for the Net Zero World (NZW) Initiative but are expected to prove useful to other related efforts. Both costs and operational metrics are provided in the study. Several cost factors, namely overnight capital costs (OCC) and operational costs are taken to be country specific. OCC is defined as the value of building the reactor in one night considering all costs prior to the start of operations including fuel for the initial core load. The value assumes the build is neither a first nor a ‘Nth’ of a kind, but somewhere in between. All costs are escalated to 2022 USD values.
| Original language | English |
|---|---|
| Place of Publication | United States |
| DOIs | |
| State | Published - Jan 2024 |
Keywords
- 29 ENERGY PLANNING, POLICY, AND ECONOMY
- 22 GENERAL STUDIES OF NUCLEAR REACTORS
- Nuclear Energy
- Cost Estimation
- Net Zero
- Energy Modeling
- Decarbonization
INL Publication Number
- INL/RPT-23-74378
- 161699
Fingerprint
Dive into the research topics of 'Nuclear Energy Cost Estimates for Net Zero World Initiative'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver