Skip to main navigation Skip to search Skip to main content

Light Water Reactor Sustainability Program Integrated Program Plan

  • Bruce Hallbert
  • , Keith Leonard
  • , Mitchell Farmer
  • , Craig A. Primer
  • , Ronaldo Szilard

Research output: Book/ReportProgram Document

Abstract

Nuclear power has safely, reliably, and economically contributed approximately 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2015 to 2040.a At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the United States reached their 40th anniversary in 2009). If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements.
Original languageEnglish
StatePublished - Dec 1 2019

INL Publication Number

  • INL/EXT-11-23452
  • 39300

Fingerprint

Dive into the research topics of 'Light Water Reactor Sustainability Program Integrated Program Plan'. Together they form a unique fingerprint.

Cite this