Skip to main navigation Skip to search Skip to main content

Interoffice Memorandum RE-04-21 "Advanced Test Reactor Power History Through Cycle 169A-1"

Research output: Book/ReportTechnical Report

Abstract

Table 1 lists the Advanced Test Reactor (ATR) N-16 constrained power history data since the Beryllium VI Core Internals Changeout (CIC) Cycle 134A-1 through Cycle 169A-1. The powers tabulated for Cycles 159A-1, 163A-1, and 167A-1 are higher than powers observed during operation, because powers are computed from cycle exposure, which for these cycles includes operation during the low-power “soak” portion of each cycle; whereas cycle length in Effective Full Power Days (EFPD) includes only the high-power “casualty” portion occurring after NF is established. Table 2 lists the accumulated N-16 lobe and total core exposure, as obtained from the ATR Data Acquisition System (RDAS) for Cycles 134A-1 through 169A-1. Table 3 lists the startup and shutdown dates and times, as obtained from logbooks or RDAS, depending on availability. The ATR power history prior to Cycle 134A 1 is presented in references (a) through (d).
Original languageEnglish
StatePublished - Apr 27 2021

Fingerprint

Dive into the research topics of 'Interoffice Memorandum RE-04-21 "Advanced Test Reactor Power History Through Cycle 169A-1"'. Together they form a unique fingerprint.

Cite this