Abstract
EXECUTIVE SUMMARY The Light Water Reactor Sustainability Program Plant Modernization Pathway has been working with industry for a number of years to leverage digital technology to extend the life and improve the performance of the existing fleet through modernized technologies and improved processes for plant operation and power generation. This includes development of modernization solutions to improve reliability and economic performance while addressing US nuclear industry’s aging and obsolescence challenges. The objective of these efforts is to deliver a sustainable business model that enables US nuclear industry to remain competitive. Digital Infrastructure (DI) research has established a technical foundation for these efforts. This effort began with technical analysis and support for a safety-related instrumentation and control (I&C) pilot upgrade being performed at Constellation Energy Generation’s Limerick Nuclear Plant. The following publicly available reports were produced as part of this effort. • INL/EXT-20-61079, Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade [1] • INL/EXT-20-59371, Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations [2] • INL/EXT-20-59809, “Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation Report and Lessons Learned [3] • INL/RPT-23-72105, Safety-Related Instrumentation and Control Upgrade: Conceptual – Detailed Design Phase Report and Lessons Learned [4]
| Original language | English |
|---|---|
| State | Published - Sep 15 2023 |
Fingerprint
Dive into the research topics of 'Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration Strategy'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver