T1 - Human reliability for design applications at a Swedish nuclear power plant
T2 - ISRCS 2009 - 2nd International Symposium on Resilient Control Systems
AU - Oxstarnd, Johanna
AU - Boring, Ronald Laurids
PY - 2009/8
Y1 - 2009/8
N2 - This paper presents work in progress on a project to develop a process for integrating human reliability analysis (HRA) into the design process used in nuclear power plant modernization and upgrade projects. Human factors, probabilistic risk, and human-system interface design experts were interviewed, resulting in six principles for the use of HRA in design. These principles are: (i) early implementation, (ii) tailored methods, (iii) scalable methods, (iv) better use of qualitative information, (v) HRA design criteria, and (vi) better HRA sensitivity to human-machine interface issues. Future efforts will center on adapting HRA techniques to meet these principles and implementing HRA as part of a plant upgrade process.
AB - This paper presents work in progress on a project to develop a process for integrating human reliability analysis (HRA) into the design process used in nuclear power plant modernization and upgrade projects. Human factors, probabilistic risk, and human-system interface design experts were interviewed, resulting in six principles for the use of HRA in design. These principles are: (i) early implementation, (ii) tailored methods, (iii) scalable methods, (iv) better use of qualitative information, (v) HRA design criteria, and (vi) better HRA sensitivity to human-machine interface issues. Future efforts will center on adapting HRA techniques to meet these principles and implementing HRA as part of a plant upgrade process.
KW - Design
KW - Human reliabilty analysis
KW - Modernization
KW - Nuclear power plant
KW - Upgrade
UR - https://www.scopus.com/pages/publications/70449358236
U2 - 10.1109/ISRCS.2009.5251374
DO - 10.1109/ISRCS.2009.5251374
M3 - Conference contribution
AN - SCOPUS:70449358236
SN - 9781424448531
T3 - Proceedings - ISRCS 2009 - 2nd International Symposium on Resilient Control Systems
SP - 5
EP - 10
BT - 2009 2nd International Symposium on Resillient Control Systems
Y2 - 11 August 2009 through 13 August 2009
ER -