Skip to main navigation Skip to search Skip to main content

Generic PWR Simulation Suite for Nuclear Training Improvement after Fukushima

Research output: Contribution to journalConference articlepeer-review

2 Scopus citations

Abstract

With the rapid development of nuclear power in recent years, the problem of Human resources shortages becomes more and more seriously. There will be a large number of people working in the nuclear power field and their technical level and safety awareness are closely related to the safety of the nuclear power plants. As a consequence, the training quality is receiving more and more attention. In the last years, Generic PWR simulator is playing a more and more important role in nuclear operation training. At the same time, due to the Fukushima Daiichi accident took place in 2011, the importance of reinforcing the training in safe operation of nuclear power plant is increasing, particularly in training in operation under severe accident conditions. Tecnatom developed severe accident module based on MAAP and also some emergency support tools, with its integration in the Generic PWR simulator, which is of great help for the training on severe accident phenomenology and emergency management.

Original languageEnglish
Pages (from-to)148-153
Number of pages6
JournalEnergy Procedia
Volume127
DOIs
StatePublished - 2017
EventInternational Youth Nuclear Congress, IYNC 2016 - Hangzhou, China
Duration: Jul 24 2016Jul 30 2016

Keywords

  • Fukushima
  • nuclear
  • PWR
  • simulator
  • training

Fingerprint

Dive into the research topics of 'Generic PWR Simulation Suite for Nuclear Training Improvement after Fukushima'. Together they form a unique fingerprint.

Cite this