TY - GEN
T1 - Enhanced and miniaturized wireless valve position indication prototype for nuclear power plants
AU - Agarwal, Vivek
AU - Buttles, John W.
AU - Al Rashdan, Ahmad
AU - Pitcher, Ryan
AU - Kiger, Chad
N1 - Publisher Copyright:
© 2018 Westinghouse Electric Company LLC All Rights Reserved
PY - 2019
Y1 - 2019
N2 - Most operating nuclear power plants (NPPs) in the United States have received approval to extend their operating licenses to 60 years. Now the nuclear industry is preparing to extend operating licenses to 80 years. While NPPs are preparing for extensions (60 years and beyond), the nuclear industry is facing a unique economic sustainability challenge in the current energy market. This is partly because the domestic nuclear industry is dependent on a high number of skilled workers to perform operation and maintenance activities. This labor-centric business model is cost prohibitive and results in high operations and maintenance costs. One of the activities performed by skilled workers in a NPP on a regular basis is manual concurrent or independent verification of manual valve position. This activity presents human error opportunities, operational and safety challenges, and regulatory compliance impacts, in addition to high labor costs. To address these concerns, a wireless valve position indication sensor technology is developed and matured by Idaho National Laboratory. In this paper, advancements achieved in the design, development, testing, and demonstration of a prototype wireless valve position indication sensor system are presented. The paper presents the electromagnetic interference evaluation of the prototype; design and development of three-dimensional (3-D) adjustable and reconfigurable universal sensor mounting units; improved quality-of-service and reliability of wireless communication; and demonstration of the technology on an experimental flow-loop fitted with nine manual valves for different valve configurations.
AB - Most operating nuclear power plants (NPPs) in the United States have received approval to extend their operating licenses to 60 years. Now the nuclear industry is preparing to extend operating licenses to 80 years. While NPPs are preparing for extensions (60 years and beyond), the nuclear industry is facing a unique economic sustainability challenge in the current energy market. This is partly because the domestic nuclear industry is dependent on a high number of skilled workers to perform operation and maintenance activities. This labor-centric business model is cost prohibitive and results in high operations and maintenance costs. One of the activities performed by skilled workers in a NPP on a regular basis is manual concurrent or independent verification of manual valve position. This activity presents human error opportunities, operational and safety challenges, and regulatory compliance impacts, in addition to high labor costs. To address these concerns, a wireless valve position indication sensor technology is developed and matured by Idaho National Laboratory. In this paper, advancements achieved in the design, development, testing, and demonstration of a prototype wireless valve position indication sensor system are presented. The paper presents the electromagnetic interference evaluation of the prototype; design and development of three-dimensional (3-D) adjustable and reconfigurable universal sensor mounting units; improved quality-of-service and reliability of wireless communication; and demonstration of the technology on an experimental flow-loop fitted with nine manual valves for different valve configurations.
KW - Electromagnetic interference
KW - Manual valves
KW - Modular design
KW - Valve position indication sensor
KW - Wireless communication
UR - https://www.scopus.com/pages/publications/85070942206
M3 - Conference contribution
AN - SCOPUS:85070942206
T3 - 11th Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies, NPIC and HMIT 2019
SP - 1504
EP - 1513
BT - 11th Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies, NPIC and HMIT 2019
PB - American Nuclear Society
T2 - 11th Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies, NPIC and HMIT 2019
Y2 - 9 February 2019 through 14 February 2019
ER -