TY - GEN
T1 - Enabling secure and cost-effective nuclear power plant wireless communications
AU - Daley, Joshua
AU - Phan, Kandy
AU - Dawson, Lon
AU - Abrahamson, Jason A.
AU - McJunkin, Timothy
N1 - Publisher Copyright:
© 2018 Westinghouse Electric Company LLC All Rights Reserved
PY - 2019
Y1 - 2019
N2 - U. S. Nuclear Power Plants are seeking to implement wireless communications for cost-effective operations. New technology introduced into power plants must not introduce security concerns into critical plant functions. This paper describes the potential for new security concerns with proposed nuclear power plant wireless system implementations and methods of evaluation. While two aspects of concern are introduced, only one (cyber attack vulnerability) is expanded with a description of test setup and methods. A novel method of cyber vulnerability discovery is also described. The goal of this research is to establish wireless technology as a part of a secure operations architecture that brings increased efficiency without introducing new security concerns.
AB - U. S. Nuclear Power Plants are seeking to implement wireless communications for cost-effective operations. New technology introduced into power plants must not introduce security concerns into critical plant functions. This paper describes the potential for new security concerns with proposed nuclear power plant wireless system implementations and methods of evaluation. While two aspects of concern are introduced, only one (cyber attack vulnerability) is expanded with a description of test setup and methods. A novel method of cyber vulnerability discovery is also described. The goal of this research is to establish wireless technology as a part of a secure operations architecture that brings increased efficiency without introducing new security concerns.
UR - https://www.scopus.com/pages/publications/85070939099
M3 - Conference contribution
AN - SCOPUS:85070939099
T3 - 11th Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies, NPIC and HMIT 2019
SP - 1514
EP - 1523
BT - 11th Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies, NPIC and HMIT 2019
PB - American Nuclear Society
T2 - 11th Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies, NPIC and HMIT 2019
Y2 - 9 February 2019 through 14 February 2019
ER -