Abstract
Fuel debundling was initially proposed as a concept to reduce the cost and quantity of high-level radioactive waste disposal in a recycling scheme in the United States. It involves removing all stainless-steel, non-fuel components of a used fuel assembly, leaving only the used fuel rods to enter the recycling process. Benefits were also realized for nuclear material accounting and control (NMAC), because the issues of self-shielding and high radiation doses would be significantly reduced compared to a complete used fuel assembly. A team is investigating different NMAC concepts that meet Nuclear Regulatory Commission regulations and non-destructive assay (NDA) technologies that can meet these requirements. The concepts have been narrowed down to an independent fuel debundling facility or a combined debundling and recycling facility that requires Category II facility regulations to be met. The results of this investigation will be presented for implementing fuel debundling in a recycling scheme in the United States.
| Original language | American English |
|---|---|
| Title of host publication | Global 2026 |
| DOIs | |
| State | Published - Aug 16 2026 |
Fingerprint
Dive into the research topics of 'Concepts for Implementing Fuel Debundling in a Recycling Scheme in the United States'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver