Abstract
This article examines the calculation and treatment of uncertainty in risk-based allowable outage times (AOTs) for operational control at nuclear power plants, where an AOT is defined as the time that a component or system is permitted to be out of service. The US Nuclear Regulatory Commission (NRC) has explored the possibility of using a nuclear power plant's probabilistic risk assessment results to determine component or system AOTs. The analysis and results from previous work prepared for the NRC on determining risk-based AOTs are presented. As part of the discussion, the article examines the inherent uncertainty in calculating risk-based AOTs and presents the difficulties in calculating these risk-based AOTs. It is noted that care should be taken when dealing with uncertainty analysis results where a time-interval is the outcome of the analysis. In addition, potential improvements in the mechanism of calculating risk-based AOTs are suggested.
| Original language | English |
|---|---|
| Pages (from-to) | 41-47 |
| Number of pages | 7 |
| Journal | Reliability Engineering and System Safety |
| Volume | 66 |
| Issue number | 1 |
| DOIs | |
| State | Published - Oct 1999 |
| Externally published | Yes |
Fingerprint
Dive into the research topics of 'Calculating and addressing uncertainty for risk-based allowable outage times'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver