Abstract
The U.S. has at least 500 municipal, electric co-operative, and publicly owned utilities with hydropower plants. These are mostly grid-connected to support the national grid. However, due to small size (at most 10 MW) and low ramping capacity, many of these hydropower plants lack the capability to form local grids to provide backup power to critical loads (during grid outage) and rural areas. Energy storage, such as Li-Ion batteries or ultracapacitors, can be used to enable these capabilities. Because this technology is relatively new, proof-of-concept demonstrations are needed to de-risk the approach before it can be deployed at scale. Two field demonstrations have been performed to validate this approach, namely, a 375 kVA / 1.24 kWh ultracapacitor with Idaho Falls Power’s 3.6 MW Old Lower (OL), 8.9 MW Lower Bulb (LB), and 8.9 MW City Bulb (CB) hydropower plants; and a 250 kVA / 320 kWh Li-Ion battery with Fall River Electric Cooperative’s 5.5 MW Felt hydropower plant. The Idaho Falls Power demonstration showed the resilience benefits of hybridization, and the Fall River Electric demonstration showed what the minimal requirements are to retrofit a hydropower plant for black start. These demonstrations are funded by the U.S. Department of Energy Water Power Technologies Office HydroWIRES Initiative.
| Original language | English |
|---|---|
| State | Published - Oct 11 2023 |
INL Publication Number
- INL/CON-23-74996
- 163349
Fingerprint
Dive into the research topics of 'Black start demonstrations of small hydropower plants with energy storage'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver