TY - GEN
T1 - An approach to dependence assessment in human reliability analysis
T2 - 30th European Safety and Reliability Conference, ESREL 2020 and 15th Probabilistic Safety Assessment and Management Conference, PSAM15 2020
AU - Park, Jooyoung
AU - Boring, Ronald L.
N1 - Publisher Copyright:
© ESREL 2020-PSAM15 Organizers. Published by Research Publishing, Singapore.
PY - 2020
Y1 - 2020
N2 - Dependence assessment refers to an approach used in human reliability analysis (HRA) to adjust a human error probability (HEP) for the following action by considering the impact of the preceding action. It has been known to significantly affect the overall results of probabilistic safety assessment (PSA). If the dependence assessment is not adequate, the result could be unconvincing for explaining the operator failures in the context of PSA. To date, several methods and some recent research have identified suggestions for treating dependence issues in HRA; however, these are still exclusively based on the intrinsic approach of the Technique for Human Error Rate Prediction (THERP), an HRA method. THERP inevitably has a challenge with the subjectivity of expert evaluation as well as the requirement for PSA and HRA expertise with resource-intensive and time-consuming processes. This paper suggests an approach to dependence assessment that could not only minimize the influence of expert judgment, but also saves time to perform the analysis with reasonable manpower. It modifies existing HRA methods with considering lag and linger effects to apply dependence effects for them. Based on a representative HRA method, i.e., Standardized Plant Analysis Risk-HRA (SPAR-H), guidance for how to apply lag and linger effects for the HRA method is suggested. Then, an investigation is carried out to compare quantification results of the revised HRA method with that of the original approach based on experimental data.
AB - Dependence assessment refers to an approach used in human reliability analysis (HRA) to adjust a human error probability (HEP) for the following action by considering the impact of the preceding action. It has been known to significantly affect the overall results of probabilistic safety assessment (PSA). If the dependence assessment is not adequate, the result could be unconvincing for explaining the operator failures in the context of PSA. To date, several methods and some recent research have identified suggestions for treating dependence issues in HRA; however, these are still exclusively based on the intrinsic approach of the Technique for Human Error Rate Prediction (THERP), an HRA method. THERP inevitably has a challenge with the subjectivity of expert evaluation as well as the requirement for PSA and HRA expertise with resource-intensive and time-consuming processes. This paper suggests an approach to dependence assessment that could not only minimize the influence of expert judgment, but also saves time to perform the analysis with reasonable manpower. It modifies existing HRA methods with considering lag and linger effects to apply dependence effects for them. Based on a representative HRA method, i.e., Standardized Plant Analysis Risk-HRA (SPAR-H), guidance for how to apply lag and linger effects for the HRA method is suggested. Then, an investigation is carried out to compare quantification results of the revised HRA method with that of the original approach based on experimental data.
KW - Dependence Assessment
KW - Human Error Probability
KW - Human Reliability Analysis
KW - Lag and Linger Effects
KW - Performance Shaping Factor
KW - Probabilistic Safety Assessment
UR - https://www.scopus.com/pages/publications/85107274654
U2 - 10.3850/978-981-14-8593-0_3860-cd
DO - 10.3850/978-981-14-8593-0_3860-cd
M3 - Conference contribution
AN - SCOPUS:85107274654
SN - 9789811485930
T3 - Proceedings of the 30th European Safety and Reliability Conference and the 15th Probabilistic Safety Assessment and Management Conference
SP - 2538
EP - 2545
BT - Proceedings of the 30th European Safety and Reliability Conference and the 15th Probabilistic Safety Assessment and Management Conference
A2 - Baraldi, Piero
A2 - Di Maio, Francesco
A2 - Zio, Enrico
PB - Research Publishing, Singapore
Y2 - 1 November 2020 through 5 November 2020
ER -