Abstract
During a nuclear power plant outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment that is being relied on to meet the requirements of the nuclear safety plan. In addition, Operations and the Outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently in outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This project will develop tools and strategies to minimize these interactions.
| Original language | English |
|---|---|
| State | Published - 2018 |
| Event | 14th Probabilistic Safety Assessment and Management, PSAM 2018 - Los Angeles, United States Duration: Sep 16 2018 → Sep 21 2018 |
Conference
| Conference | 14th Probabilistic Safety Assessment and Management, PSAM 2018 |
|---|---|
| Country/Territory | United States |
| City | Los Angeles |
| Period | 09/16/18 → 09/21/18 |
Keywords
- Configuration management
- Outage
- Requirements monitor
Fingerprint
Dive into the research topics of 'A tool to support improved outage risk management'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver