N2 - Many of the U.S. nuclear power plants are approaching the end of their 60-year licensing period. The U.S. Department of Energy Light Water Reactor Sustainability Program is conducting targeted research to extend the lives and ensure long-term reliability, productivity, safety, and security of these plants through targeted research, such as integrating advanced digital instrumentation and control technologies in the main control room. There are many challenges to this, one being the integration of human factors engineering in the design and evaluation of these upgrades. This paper builds upon recent efforts in developing utility-specific guidance for integrating human factors engineering in the control room modernization process by providing commonly used data collection methods that are applicable at various phases of the upgrade process. Advantages and disadvantages of each method are provided for consideration of an optimal human factors evaluation plan to be used throughout the lifespan of the upgrade process.
AB - Many of the U.S. nuclear power plants are approaching the end of their 60-year licensing period. The U.S. Department of Energy Light Water Reactor Sustainability Program is conducting targeted research to extend the lives and ensure long-term reliability, productivity, safety, and security of these plants through targeted research, such as integrating advanced digital instrumentation and control technologies in the main control room. There are many challenges to this, one being the integration of human factors engineering in the design and evaluation of these upgrades. This paper builds upon recent efforts in developing utility-specific guidance for integrating human factors engineering in the control room modernization process by providing commonly used data collection methods that are applicable at various phases of the upgrade process. Advantages and disadvantages of each method are provided for consideration of an optimal human factors evaluation plan to be used throughout the lifespan of the upgrade process.
KW - Control room modernization
KW - Human factors engineering
KW - Human-systems interface evaluation
KW - Nuclear power plants
UR - https://www.scopus.com/pages/publications/85049665100
U2 - 10.1007/978-3-319-94229-2_43
DO - 10.1007/978-3-319-94229-2_43
M3 - Conference contribution
AN - SCOPUS:85049665100
SN - 9783319942285
T3 - Advances in Intelligent Systems and Computing
SP - 441
EP - 452
BT - Advances in Artificial Intelligence, Software and Systems Engineering - Joint Proceedings of the AHFE 2018 International Conference on Human Factors in Artificial Intelligence and Social Computing, Software and Systems Engineering, The Human Side of Service Engineering and Human Factors in Energy, 2018
A2 - Ahram, Tareq Z.
PB - Springer Verlag
T2 - Joint Proceedings of the AHFE 2018 International Conference on Human Factors in Artificial Intelligence and Social Computing, Software and Systems Engineering, The Human Side of Service Engineering and Human Factors in Energy, 2018
Y2 - 21 July 2018 through 25 July 2018
ER -