Engineering
Transients
100%
Irradiated Material
96%
Progress Report
85%
Test Pile
85%
Nuclear Fuel
85%
Thermocouple
64%
Weld
64%
Lifecycle
57%
Burnup
57%
Fuel Rod
57%
Shielded Enclosure
42%
Design Presentation
42%
Advanced Fuel
42%
Actuator
42%
Fuel Pellet
42%
Hole Centre
42%
Centerline
42%
United States
42%
Department of Energy
42%
Heat Source
42%
Measurement Uncertainty
42%
Feedthrough
42%
Mechanical Design
42%
Ferritic/Martensitic Steel
42%
Plasma Facing Component
42%
Yield Point
32%
Oxide Dispersion Strengthened
32%
Test Reactor
28%
Welding
28%
Circumferential Weld
21%
Experimental Trial
21%
Oxide Dispersion Strengthened Ferritic Steel
21%
Stack Height
14%
Leak Rate
14%
Seal Welding
14%
Chamber Pressure
14%
Test Fuel
14%
Loss of Coolant Accidents
14%
Circumferential
14%
Pressurization
14%
Light Water Reactors
14%
Backup
14%
Nuclear Reactor
10%
Compression Testing
10%
Compression Test
10%
Beam Irradiation
10%
In-Situ Testing
10%
Good Agreement
10%
Harsh Condition
10%
Materials Degradation
10%
Keyphrases
Irradiated nuclear Fuel
91%
Re-instrumentation
85%
Capability Development
85%
Halden
85%
Rodlet
54%
Fuel Dispersal
47%
Fuel Fragmentation
47%
Fuel Relocation
47%
Hot Cell
47%
Transient Experiments
47%
Fuel Irradiation
42%
Fuel Behavior
42%
Advanced Fuel
42%
Design Presentations
42%
Accident Situation
42%
Autonomous Welding
42%
Radiation Test
42%
Reactor Accident
42%
Remote Operation
42%
High Burnup
42%
Irradiation System
42%
Mechanical Design
42%
Mechanical Property Analysis
42%
End Cap
37%
Reactor
34%
Idaho National Laboratory
31%
Irradiated Materials
22%
Fuel Rod
15%
Thermocouple Attachment
11%
Shielding Enclosure
11%
Center Hole
11%
Temperature Measurement
11%
Heat Source
11%
Feedthrough
11%
Irradiation Experiment
11%
State Department
11%
Pile Test
11%
Measurement Uncertainty
11%
United States
11%
Provided Support
11%
Fuel Pellets
11%
Department of Energy
11%
In-pile
11%
UO2 Fuel
11%
Steel Beam
10%
Pillar Compression Testing
10%
Quasi-static Nanoindentation
10%
Welding Process
8%
Circumferential Welds
5%
Dry Drilling
5%